Project 5
Huntsman
Chemicals - Llanelli, South Wales Shutdown 1997 and 1998 Mechanical
inspections, equipment overhaul and planned maintenance work carried out at the
Huntsman Chemicals Site, Bynea, Llanelli.
Shutdown duration - 7 days  ROCKALL
supplies teams of Mechanical Fitters, complete with protective clothing, safety
wear and basic tool kits to Huntsman for the duration of the shutdown. In the
period leading up to the shutdown ROCKALL located and mobilised a locally based,
quality labour force whose duties and responsibilities embraced the following:-
making/breaking
bolted flanged gasketted and other forms of joints hydro-pressure testing
of vessels making/breaking bolted closures (square/manways/etc) removal of lagging
(non abestos) simple jigs/fixtures/fabrications to facilitate working only (i.e
not permanent plant) simple pipework fabrication (screwed/preperation of welding)
effecting the following:- removal/refit manual and actuated valves removal/refit
of pipework opening of vessels nozzles removal/refit of vessel instrumentation/fitting
 removal/refit
of pumps opening of vessel inspection closures removal/refit of relief valves
renewing of joint gaskets/jointing pressure of testing of vessels removal
of redundant plant installation of new plant removal of new plant removal
only of bursting disc assemblies renewal of equipment internals (e.g filter
elements) The
Shutdown Project was completed on time and with no labour turnover.
|