Project 8
Nippon
Electric Glass Construction
of a £200 million glass manufacturing facility specialising in producing glass
for television screens on a green field site in Cardiff. The
scope of work involved Structural and Mechanical installations for the plant which
was carried out by DMD with labour supplied by Rockall. The
contract consisted of:- 
Construction
and installation of main core pipework; Installation of furnace and batching area;
Construction of platforms, walkways, stairs; Installation of ductwork;
Installation of air purifying, gas, water and steam pipework. Contract
duration - 6 months. Rockall
provided DMD with engineering personnel when required at short notice over the
duration of the contract in the following numbers and disciplines:-
Welders
(24) Fabricators (26) Platers (13) Riggers (18) Mechanical Fitters
(19) Mates (12) The
project was completed to schedule and within budget. Rockall were commended
for the consistently high standard of labour supplied.
|